REQUEST FOR PROPOSALS
FOR CONSTRUCTION MANAGEMENT SERVICES
Town of Berlin Highway & Public Works Garage
From: The Town of Berlin, Attn: Ture Nelson
and
Wiemann Lamphere Architects, Attn: David Roy
Date: June 4th, 2025
I. REQUEST FOR CONSTRUCTION MANAGEMENT PROPOSALS
The Town of Berlin and Wiemann Lamphere Architects, Inc. are hereby seeking proposals of contractors for a Construction Management (CM) service as outlined in this Request for Proposals (RFP).
The project site is located at 108 Shed Road Berlin, VT and is a proposed Highway Department and Public Works garage. The existing highway garage is located on the same lot and will remain in operation while construction of the new building takes place.
The replacement structure will be an 9,000 SF single story steel structure with office and mezzanine above. The site is served by municipal water and sewer.
The project is currently in the Schematic Design phase with the Town of Berlin. Permits are anticipated to be in hand by March 2026
The CM will take the Engineering Plans and secure contract vendors to successfully complete the project within the project construction schedule detailed below. One goal of this process is to utilize the CM’s knowledge of current market conditions to work with the design team and work force to optimize the design for cost, constructability, and product availability. Verification of the project design estimate and continued analysis of the project costs at each phase is an expectation of the CM. Berlin will be working procuring a loan from the municipal bond bank, based on a positive bond vote outcome on March 2026.
A. Budget
The preliminary project construction budget is $4.4 (M). This number does not include budget amounts for permitting, architectural and engineering fees and other associated soft costs.
B. Construction Timeline
It is anticipated that construction could start June 2026 and anticipate being completed February 2027
II. QUALIFICATIONS
A. Firm1. Provide a brief description of your firm’s size, capabilities, people and business approach.
2. Provide evidence of financial strength and manpower required to complete the project. Provide an AIA 305 Qualification Statement.
3. Provide a list of five customers and five trade references. Include addresses and telephone numbers.
4. Describe the extent of your firm’s experience involving comparable projects utilizing the Construction Management (CM) delivery process.
5. Provide evidence that your firm is able to secure a 100% Payment and
Performance Bond in the form of a letter from your bonding company. Provide your cost for bonding the project assuming $4.4 MM total construction cost.
6. Describe your firm’s safety program and record. Explain your system of enforcement with your own forces and subcontractors. Explain the safety protocols to be put in place and their conformance with OSHA and local code requirements as well as health and safety regulations. Explain any OSHA and/or local code violations your firm may have received in the past five years.
7. Describe how your firm approaches sustainability and describe actions your firm incorporates on each project.
. Team
1. Describe how you will structure your team and identify who the members will be including but not limited to Project Executive, Project Manager, Superintendent, Estimator, Pre-Construction Services Lead. Provide resumes and relevant experience of each.
2. Describe each member’s role in the project and their corresponding percentage of effort with the project.
2. Provide evidence of consistently accurate estimating during the design phase and the ability to complete the construction phase within the budget given in the design phase. If your firm has a full-time dedicated “in house” estimating staff, provide resumes for this staff. Provide an example estimate on a similar past project.
4. Describe your relationship with the sub-contractor community and ways in which you will ensure sufficient bid representation across all divisions, specifically within the central T region.
5. Describe any capabilities your firm may have related to self-performance of work and in what instances or scopes of work may be involved. Include information on how those services are part of a fair and competitive bidding process.
6. Describe the actions your firm could take to ensure that the project team initially identified remains in place on the project through completion.
7. Provide a copy of your insurance coverage. Including General Liability, Worker’s Compensation and Builder’s Risk.
C. Services
1. Describe your approach to working with the Owner, Design Team, and subcontractors.
2. Provide an appendix detailing the pre-construction scope of services to be provided including but not limited to:
Initial verification of SD estimate of probable cost.
Provide a 100% DD set estimate of probable cost.
Participate in meetings with the Owner and A/E team.
Constructability review and value management participation throughout the process.
Provide input on the timing, construction phasing and schedule of the project; and
Provide an updated estimate of probable cost at 75% CD.
3. Provide information detailing the scope and duration of services to be provided during bid and construction phases. What special methods/techniques do you employ? The following items outline a guide to be used as CM for scope of services during bid and construction phases, but is not intended to be all inclusive:
Solicit a minimum of three bids for each trade. Contracts with subs will be between sub and CM.
Bid Package coordination.
Procure list of subcontractors to bid on the project and review with Architect and Owner, prepare bid requests, and assess submission for scope, clarity and cost.
Identify and coordinate long lead time material and/or equipment items.
Constructability review and value management participation throughout the process.
Establish and maintain an on-site office during Construction.
Lead weekly construction meetings and distribute minutes of the meeting.
Coordinate all utility work with affected utilities.
Provide field coordination.
Provide construction scheduling.
Manage all construction sub-contractors in the field;
Coordinate with all Owner’s vendors.
Review and validate any T&M work.
Review contractors change requests and make recommendations to the Owner and Architect.
Manage shop drawing and submittal process.
Assure that record drawings (as-builts) are kept current.
Maintain a file of all project documentation, submittals etc. to be given to Owner at project completion.
Coordinate punch list inspections with the A/E team and closeout of punch list items; and
Lead weekly construction meetings and maintain budget and schedule updates to present at those meetings and schedule updates to present at those meetings.
4. How will your firm ensure quality workmanship and material? Describe the system that is in place to ensure good workmanship and installation of proper materials and equipment by your own forces and the subcontractors.
5. Describe your firm’s approach to managing change orders and requests for them.
6. Provide a description of project management software that will be used during the construction process and how your firm utilizes technology.
III. Fees
1. Provide a fixed lump sum fee for overall pre-construction services and estimating based on the preconstruction scope of services.
2. Provide a fixed lump sum fee for General Conditions including a line-item breakdown identifying services provided by the GC or by others.
3. Provide a construction management fee percentage for the project assuming a $4.4 M construction package.
4. Indicate your percentage mark-up for change orders.
IV. Evaluation and selection process
1. Responses shall be provided in two (2) separate PDF documents and submitted via email. The first document shall be titled “Qualifications” and contain the information requested in Section II, sub-sections A (“Firm”), B (“Team”) and C (“Services”); the second document shall be titled “Fees” and contain the information requested in Section III (“Fees”). Send Section III to Steven Roy ONLY.
2. The Town of Berlin and the design team will review the submittals utilizing a framework for scoring the proposals.
3. There will not be a formal site visit scheduled; however, if one is requested, it will be conducted at a date and time that works for all.
4. Questions may be directed to David Roy, on or before July 15h @ 12:00 noon. Response to addenda will be distributed to all by July 30th 2025 by 4:00 p.m.
5. Proposals are Due by 4:00 pm on Monday August 11th , 2025. Late responses may not be considered and shall be submitted electronically via email to: DRoy@WiemannLamphere.com.
6. Finalists will be identified and may be requested to attend a finalist interview on the week of August 11th.
7. Once a selection is made, The Town of Berlin will look to finalize a contract with the selected firm.
8. The Town of Berlin reserves the right to accept, reject, or request modification to any response.
Sincerely,
The Town of Berlin.
Ture Nelson
Acting Town Administrator
c. David Roy, WLA (via email)
Tim Davis
Craig Pelletier
- Title
- RFP-Garage Construction Management Services
- Application Deadline
- 07/04/2025
- Location
- BERLIN, VT
- Application URL
- www.berlinvt.gov/s/Garge-CM-RFP.pdf
Contact Information
- Name
- Nelson, Ture
- Phone Number
- (802) 552-8801
- townadministrator@berlinvt.gov
- Best Method of Contact